01
Configuration overview
- Wet-service and drying components
- Local extraction and electrical accessories
- Eyewash, shower, seating, and safety fixtures
Service and work-area components
Laboratory accessories should be selected as part of the room and utility schedule, not as late add-ons. Connection standards, materials, mounting, service responsibility, accessibility, inspection, and destination requirements must be confirmed for each component.
Final materials, dimensions, performance requirements, and compliance criteria must be confirmed in the quotation and technical review.
Request a quotation
01
02
03
Product planning
Use these planning points to organize the room, equipment, service, and operating information needed before a configuration is confirmed.
List every sink, faucet, outlet, drying rack, extraction arm, eyewash, shower, stool, and related fitting by room, position, quantity, connection, and responsible trade.
Confirm voltage, socket type, water pressure and connection, drainage, pipe thread, duct size, mounting surface, accessibility, and local requirements before ordering.
Keep shut-offs, traps, filters, duct joints, electrical isolation, test points, and replaceable components accessible after furniture and equipment are installed.
Technical brief
These fields provide a practical review framework rather than fixed model claims. Record the agreed selection in the quotation, drawings, and technical submittal before production.
Reference model guide
Use these original YOJIA reference codes to compare common configurations and prepare an inquiry. They are planning identifiers, not copies of another manufacturer's models or fixed production guarantees.
| Reference model | Configuration | Reference dimensions | Selection notes |
|---|---|---|---|
YJ-AS-SINK-400 | PP laboratory sink | 400 × 400 × 250 mm bowl | Reference wet-service component; worktop opening, outlet, trap, and compatibility require confirmation. |
YJ-AS-FAUCET-3 | Three-outlet laboratory faucet | Project connection | Bench-mounted service fitting with medium, pressure, thread, finish, and controls specified separately. |
YJ-AS-PEG-600 | PP drying pegboard | 600 × 450 mm panel | Wall- or rack-mounted reference with removable pegs, drip tray, fixing, and drainage review. |
YJ-AS-EXA-075 | Articulated extraction arm | 75 mm nominal connection | Local capture accessory; reach, hood, hose, duct, and ventilation performance are project-defined. |
All dimensions are nominal planning references. Final materials, thicknesses, loads, ventilation criteria, fixtures, interfaces, compliance evidence, and supplied scope must be recorded in the approved quotation and technical documents.
PRODUCT VIEW
Images show reference configurations. Confirm the exact supplied model, finish, dimensions, fixtures, and accessories in the final quotation.









Buyer questions
Clear project inputs help the team identify the right configuration and the details still requiring technical review.
Late selection can create incorrect cut-outs, service points, mounting, or access. It is better to approve the accessory and utility schedule with the furniture drawings.
No. The responsible safety and design team should determine required equipment, locations, accessibility, supply conditions, testing, and applicable rules. The furniture package coordinates the confirmed interfaces.
Provide destination voltage and frequency, socket and plug standard, circuit and protection design, quantity, mounting location, connected load, isolation method, and responsible electrical contractor.
RFQ / Project inquiry
Share the room plan, quantity, destination, and technical requirements for a project-specific response.